Skip to content
Finished work stays our responsibility, with a 1-year warranty behind it (000) 000-0000

Building on, not moving

Home Additions in Oxford

When the house is too small but the location is right, an addition gives you the space. Excavation through final paint runs under one agreement, with one team setting the order.

Tell us who the new space is for — (000) 000-0000
New tile being set on a freshly finished wall

Staying Put, With More Room

An addition fits when you like the street, the school and the yard, and the house itself has simply run out of space. Kids sharing a room they've outgrown, an aging parent who needs a ground-floor bedroom, or work that has taken over the dining table usually start the conversation.

No project involves more trades in sequence, from excavation and foundation through framing, the outer shell, rough-ins, inspections and the tie-in to the existing house, then the interior. A single contract for all of them gives you one schedule to follow and one company responsible for the seam between old and new.

What an Addition Takes

  • Foundation and shell

    Footings and a slab or crawlspace, then framing, sheathing and a weather barrier, with the new floor height matched to the rooms you already have.

  • Joining old and new

    The existing exterior wall is opened late in the job, the new exterior is finished to match the house, and heating and cooling are extended into the space.

  • Finished interior

    Insulation and drywall, then trim, doors and paint, along with the circuits, supply lines and drains needed for a new bath or laundry room.

How the Addition Goes Up

  1. Check what the lot allows

    Zoning decides the required distance from your lot lines and the maximum size of the addition. Those limits are confirmed before any layout is drawn up.

  2. Raise the shell

    Footings are poured, walls are framed and the shell is closed in while your current rooms stay sealed off, with inspections at each required stage along the way.

  3. Connect and finish

    Near the end, the wall between old and new comes open, then drywall, trim and paint complete the space and we walk it with you.

Addition Questions

How do we decide between adding on and moving?

Compare the itemized cost of the addition with what selling and buying would cost you, then factor in how much you like the location. If zoning or the lot limits what you can build, moving may win.

Will the inside of our house be torn up the whole time?

Not for most of it. Foundation, framing and the shell are built outside, and the wall into the house is opened late, so the indoor mess mostly falls in the last few weeks.

Running Out of Room?

Maybe you need a nursery, a den or a first-floor suite. Tell us what the space needs to do and which side of the house has room, and we'll explain the steps from footings to finish.

Talk through where an addition could go — (000) 000-0000